Make sure your wigs are securely attached; it's going to be a whirlwind of a week. I'm getting a little exhasuted thinking about it, and it's only Monday morning, but this is a crucial time on our reno. Tomorrow both the kitchen cabintery and all our new windows arrive. Phew.
The main floor has been mostly drywalled in anticipation (take a look below) and the contractors are ready to receive everything and get rocking and rolling on it all. So, a few things have to happen in quick succesion - #1 The windows have to be installed asap. #2 The new floor has to be laid down. #3 The kitchen cabinetry gets installed. Tired yet? lol